IMPORTANT NOTE:
The Master Plan process includes two major phases -
Phase 1:
In phase one, the campus along with consultants, DLR Group, produced a site plan of conceptual uses and changes to the campus over the next 15 years. Community open forums allowed community members to provide high-level feedback that can be incorporated into the environmental analysis
Phase 2:
Environmental consultants will use that phase 1 site plan and concepts for the formal Notice of Preparation for the Draft Environmental Impact Report. This CEQA process includes formal comment periods for the EIR preparation, draft, and final report. The full site plan and site analysis is provided to the entire community for review. The draft EIR draft report will be released September 2023 with BOT adoption January 2024.